Distribution & MCC Panels Build-up

Technical Specifications

ClientEL-Sewedy special cables
Project CodeS04780
CountryEgypt
IndustrySteel and casting
Scope of Work
Documentation Wiring diagram Panel building (Power & Control)

Project Overview

EISAC Automation, as the Main Contractor, successfully delivered the engineering and build-up of high-capacity Distribution and MCC (Motor Control Center) panels for EL-Sewedy Special Cables in Egypt (Project S04780). Catering to the rigorous demands of the Steel and Casting industry, the project focused on providing a robust power distribution network and reliable motor control solutions. Our scope included detailed technical documentation, precise wiring diagrams, and the professional assembly of Power and Control panels designed for heavy-duty industrial environments. This turnkey execution ensures stable power management and enhanced operational safety, supporting the continuous production needs of EL-Sewedy’s specialized manufacturing facilities.