Siemens SIRIUS 3RW55 Soft Starter 200 kW Repair

The Siemens SIRIUS 3RW55 Soft Starter is an industrial soft starter used to reduce motor starting current and mechanical stress in pumps, fans, compressors, conveyors and process machinery. This repair reference targets a representative 200 kW motor application; final soft-starter selection depends on motor full-load current, supply voltage, start duty and application conditions.

Brand Siemens
Equipment 3RW5558-6HA16
Equipment Category SIRIUS 3RW55 Soft Starter – 200 kW class
Industry Chemical
Fault Reported
  • Soft starter does not start the motor, trips during acceleration, shows phase/SCR/overload faults, or has control-board / power-stage malfunction.
Repair Turnaround Time Typical reference: 3–7 working days

The Challenge

A 200 kW motor-driven process could not start reliably, creating repeated production interruptions and risk of excessive mechanical and electrical stress.

Diagnosis

  • Control supply, input phases, thyristor/SCR power paths, bypass contactor, firing/gate circuits, current sensing, cooling system, HMI/control PCB, communication interface and motor/load conditions were inspected.

Our Solution

  • Power and control sections were diagnosed at component level; defective SCR/gate-driver/control components were replaced as required, cooling and bypass circuits were serviced, connections were restored, parameters were reviewed, and the starter was tested through repeated start/stop cycles.

Testing Performed

  • Control-power test; input-phase verification; SCR static test; gate/firing test; bypass operation test; motor start/stop test; current monitoring; communication check where fitted; thermal stability test; repeated-cycle run test.

Final Result

The reference repair process restores controlled motor starting and stopping after the unit passes electrical, power-stage, bypass, protection and functional run tests applicable to the starter.

Common Fault Codes & Causes

  • Bypass Protective Shutoff – Excess current in bypass operation; check load and starter sizing.
  • Switching Element L1/L2/L3 Failed – Defective switching element / thyristor path.
  • Phase Control Failure – Motor wiring, inside-delta, ground fault or unstable start parameters.
  • Current Measuring Range Exceeded – Measurement range exceeded or sensor/actuator issue.
  • Device Error – Internal self-test, contactor, switching element or electronics failure.
  • FW Update Faulty – Incomplete/incompatible firmware or interrupted update.
  • Switching Frequency Time Not Kept – Maximum starts in monitoring period exceeded.
  • Main Power Rotation Faulty – Incorrect phase sequence / rotation field.
  • Communication / Bus Fault – Network, module or communication configuration issue.
  • Motor / Starter Overload – Excessive thermal loading, heavy start duty or incorrect sizing.

Preventive Maintenance

  • Keep cooling paths clean, verify cabinet temperature, inspect line/motor terminals, check bypass contactor condition, confirm motor FLC and start-duty settings, protect the control supply, and investigate repeated phase/SCR/overload trips promptly.

Related Services

  • Industrial Electronics Repair; Soft Starter Repair; VFD Repair; Motor Control Repair; Control Board Repair; Power Electronics Repair

Need Professional Repair?

Contact Our Engineering Team Today
EISAC AUTOMATION
REPAIR • TEST • RESTORE
KEEPING INDUSTRY MOVING